# Reasonable acceptance rate coexist with posterior spikes

**URL:** <https://forum.dynare.org/t/reasonable-acceptance-rate-coexist-with-posterior-spikes/3674>\
**Category:** Dynare help (legacy posts)\
**Created:** [6 February 2014 04:28 UTC](https://forum.dynare.org/t/reasonable-acceptance-rate-coexist-with-posterior-spikes/3674 "2014-02-06T04:28:10Z")\
**Posts on this page:** 1\
**Showing post:** 4

<div class="post-metadata">

**Author:** ![jpfeifer](https://forum.dynare.org/user_avatar/forum.dynare.org/jpfeifer/32/5044_2.png) [@jpfeifer](https://forum.dynare.org/u/jpfeifer)\
**Post date:** [6 February 2014 09:33 UTC](https://forum.dynare.org/t/reasonable-acceptance-rate-coexist-with-posterior-spikes/3674/4 "2014-02-06T09:33:39Z")

</div>

As we are talking about prior-posterior plots, I would need to see the mod-file or the prior.  
See also here [[Evaluation (robustness) of the Bayesian estimation results](https://forum.dynare.org/t/evaluation-robustness-of-the-bayesian-estimation-results/3653/1))

---

_[View the full topic](https://forum.dynare.org/t/reasonable-acceptance-rate-coexist-with-posterior-spikes/3674)._
