# Posterior distribution plot from different chains

**URL:** <https://forum.dynare.org/t/posterior-distribution-plot-from-different-chains/5972>\
**Category:** Dynare help (legacy posts)\
**Created:** [10 January 2017 23:48 UTC](https://forum.dynare.org/t/posterior-distribution-plot-from-different-chains/5972 "2017-01-10T23:48:29Z")\
**Posts on this page:** 2\
**Page:** 1

<div class="post-metadata">

**Author:** ![ZBCPA](https://forum.dynare.org/letter_avatar_proxy/v4/letter/z/aeb1de/32.png) [@ZBCPA](https://forum.dynare.org/u/ZBCPA)\
**Post date:** [10 January 2017 23:48 UTC](https://forum.dynare.org/t/posterior-distribution-plot-from-different-chains/5972/1 "2017-01-10T23:48:29Z")

</div>

Dear Johannes,

Could I ask you two questions about posterior distribution plot?

1. In default, dynare runs two chains during estimation,but only generates one posterior distribution plot. How do we know this plot represents posterior draws from which one of the two chains?

2. If I run 5 chains, can I see each chain’s posterior distribution plot, so together 5 plots?

Thanks in advanced.

Kind regards,  
Huan

---

<div class="post-metadata">

**Author:** ![jpfeifer](https://forum.dynare.org/user_avatar/forum.dynare.org/jpfeifer/32/5044_2.png) [@jpfeifer](https://forum.dynare.org/u/jpfeifer)\
**Post date:** [17 January 2017 10:46 UTC](https://forum.dynare.org/t/posterior-distribution-plot-from-different-chains/5972/2 "2017-01-17T10:46:19Z")

</div>

Dynare drops the burnin draws from each chain and then pools the draws from both chains. Hence, the graphs are for the pooled draws.
