# Hack for imposing inequality constraints during estimation

**URL:** <https://forum.dynare.org/t/hack-for-imposing-inequality-constraints-during-estimation/2039>\
**Category:** Dynare contributions and examples\
**Created:** [25 June 2011 00:17 UTC](https://forum.dynare.org/t/hack-for-imposing-inequality-constraints-during-estimation/2039 "2011-06-25T00:17:24Z")\
**Posts on this page:** 1\
**Showing post:** 3

<div class="post-metadata">

**Author:** ![cfp](https://forum.dynare.org/letter_avatar_proxy/v4/letter/c/ed655f/32.png) [@cfp](https://forum.dynare.org/u/cfp)\
**Post date:** [15 February 2012 11:04 UTC](https://forum.dynare.org/t/hack-for-imposing-inequality-constraints-during-estimation/2039/3 "2012-02-15T11:04:59Z")

</div>

Your PM suggested that you’re trying to use this method to impose bounds on simulated variables rather than on the steady state. See Michael’s post here for details on doing that: [[The Zero Lower Bound Constraint on Nominal Int. Rate](https://forum.dynare.org/t/the-zero-lower-bound-constraint-on-nominal-int-rate/1940/1))

---

_[View the full topic](https://forum.dynare.org/t/hack-for-imposing-inequality-constraints-during-estimation/2039)._
